Westfield Bondi Embedded Network Metering

Date

Completed

June 2017

Client

SCENTRE

Duration

3 Months

Scope Of Works

Reconfiguration of the 493 Supply Authority metering to private embedded network, plus configuration of the MSB’S and submains.

Temporary generators and re-configured infrastructure allowed Goldline to keep all of the critical tenants with power during the shutdowns within the operating centres and the two commercial towers above.